Dundee V&A reaches a milestone in its construction
Dundee’s V&A Museum of Design has reached a milestone with the completion of its upper floor.
V&A Dundee has unveiled where the Michelin Design Gallery will sit - between two separate buildings which connect on its second floor.
Director Philip Long said staff were now in “countdown mode” for the opening of the £80.1m museum in summer 2018.