'CLEANERS' timetable
- a rough breakdown of what happens when |
 |
 |
|
 |
 |
 |
 |
August 17 to 30
A detailed episode outline is produced.
August 31 to Sept 6
The team receives notes from the editorial group and revises the storyline.
Sept 7 to 20
The team produces a first draft script.
Sept 21 to 27
The team receives notes from the editorial group.
Sept 28 to Oct 11
The team produces a second draft script.
Oct 12 to 18
The team receives notes from the editorial group.
Oct 19 to 25
The team polishes the second draft.
|
 |
 |
 |
|
 |
 |
|