The pub was for men only. Other facilities included a library, public hall, shop and canteen. There was even street lighting (powered by hydroelectric generators). There are now hydroelectric turbines at the base of all the dams and one in the Foel Tower. The total maximum energy output is 4.6 megawatts.
The dams were built in two phases, firstly construction in the Elan Valley and later the Claerwen. The foundations of Dol-y-mynach dam were laid in phase one as the site would have flooded once Caban Coch had filled up. Local rock was only suitable for use inside of the dams. The hand-chiselled facing stones were transported from Glamorgan.
In July 1904 King Edward VII and Queen Alexandra opened the Elan dams and water started flowing along 118 km of pipeline to Birmingham.
The whole of the Elan scheme had cost £6 million and employed 50,000 men in total.
Water is extracted from the Foel Tower to the Severn Trent water treatment works. It is cleaned by rapid gravity filter sand beds. Chlorine, fluoride and lime (to neutralise the acidic water) are added.
The Foel Tower stands 52m above the Frankley Reservoir in Birmingham. The gradient of the aqueduct which links them averages 1 in 2,300, which allows the water to flow by gravity alone. The submerged dam at Garreg Ddu holds water back on the upstream side so that water can always be extracted at the Foel Tower. The bottom of Caban Coch Reservoir is too low to allow water to be gravity fed to Birmingham. Extraction from here would require pumps. The River Elan is compensated with 123 million litres of water a day from Caban Coch. South Wales can also benefit from this water as the River Elan flows into the River Wye from which water can be transferred in times of shortage. Water is extracted from Caban Coch Reservoir for the Welsh Water treatment works which supplies the local area.
300 million litres of water a day from the Elan Valley can be extracted to supply Birmingham. Once the Claerwen Dam was completed this nearly doubled the available water for Birmingham.
The building of the second phase dams was delayed due to the 1st and 2nd World Wars. Work started in 1946, engineering advancements required the building of just one large dam rather than 3 smaller ones.
The Claerwen dam is built of concrete but stone faced to harmonise with the older dams. Masonry work was carried out by 100 Italian stonemasons as most British masons were occupied with rebuilding the House of Commons and other buildings damaged in the war.
A total of 470 men worked on this dam. They were housed in the local community and all transport was by road.
The dam was completed in 1952 when it was opened by Queen Elizabeth II.
The information on this page was supplied by Dwr Cymru and the Elan Valley Trust.
Elan Valley Website
The BBC is not responsible for the content of external websites.