Shropshire

Work to strengthen 'corroded' Tern Hill bridge announced

Tern Hill bridge Image copyright Google
Image caption Shropshire Council said traffic disruption during the work would be "minimal"

Work is to be carried out on a road bridge which has "corroded significantly", Shropshire Council has said.

It said the Tern Hill No 1 bridge, which carries the A41 over the River Tern, requires maintenance to ensure it is structurally safe in the long-term.

Four large-diameter corrugated steel pipes which make up the bridge will be strengthened using structural liners.

The proposed work is scheduled to start on 2 June and last four months.

Related Internet links

The BBC is not responsible for the content of external Internet sites